Lake Dallas High School

  • A rendering of an aerial overview of the work at Lake Dallas High School

    Vision

    Lake Dallas High School will receive extensive updates to modernize the campus, including additions to the main building as well as a new multipurpose indoor extracurricular facility. The updates will increase safety and security through physical and a visual updates. By consolidating administrative areas, the school will receive expanded educational spaces and enhanced student services. With the addition of a multipurpose indoor facility, the school will receive a facility that serves multiple fine arts and extracurricular programs, and enhances the ability of the students within the programs to grow and develop.

    Features

    • New Entries: Overhauled main entry and student entry at the front of the building, providing a new aesthetic as well as a secure vestibule to better screen primary access to the building.
    • New Classrooms: The new entry also expands the building’s footprint, as the administrative area will move to the newly constructed portion at the front of the building, and its old space will be repurposed for classrooms. Special education learning spaces will also be added to the front of the building.
    • Multipurpose Indoor Practice Facility: A new 100-yard indoor multipurpose facility will provide athletics and fine arts programs with a large area to practice and avoid bad weather or extreme heat. The facility will also include storage and a meeting space.
    • Expanded Shared Spaces: The cafeteria will be expanded to provide more room for lunches, and the front lobby will be expanded to make room near the fine arts performance halls. Some hallways will also be touched up to improve their appearances.

    Timeline

    • Project Start: June 2020
    • Estimated Completion: August 2021
    • Demo of Existing Front Entry, Construction of Interior Temporary Reception, Classroom Renovations, June 2020-August 2020
    • Site Directional Signage and Bond Construction Signage, August 2020
    • Demo and Partial Recladding of Exterior, August 2020-October 2020
    • Lower Level Classroom and Elevator Renovations, September 2020-October 2020 (After School Hours)
    • Construction of New Addition and Parking Lot, August 2020 -August 2021
    • Multi-Purpose Indoor Practice, July 2020 – August 2021
    • Renovation of Existing Spaces connecting to Addition, June 2021-August 2021

    Renderings

    Lake Dallas High School Bond Project Renderings
    A rendering of an aerial overview of the work at Lake Dallas High School A rendering of the new main entry to Lake Dallas High School A rendering of the new student entry to Lake Dallas High School
    A rendering of the interior of the new student entry to Lake Dallas High School A rendering of the expanded cafeteria at Lake Dallas High School A rendering of the area outside the Performance Hall, which will be renovated
    A rendering of the renovated walkway above the cafeteria A rendering of the new multipurpose indoor facility